Modern Amenities

Coming Soon! FOOD HALL

160 Federal will cement its reputation as the heart of the Financial District when the ribbon is cut on a state-of-the-art Food Hall, coming soon. Check back for news on the 20 new dining options that await tenants and the surrounding community.

FITNESS CENTER

160 Federal offers a new state-of-the-art fitness center with locker rooms and showers.

BUILDING MANAGEMENT

Rockhill Management offers next-level tenant services, event planning and amenity coordination through their experienced on-site management team.

ON-SITE PARKING

The building offers a two-level, 100-space below-grade parking garage, a valet, and a car wash service.

AMENITY-RICH NEIGHBORHOOD

The neighborhood is home to 200+ retailers, 120+ restaurants and bars, 1,900 new residential units, 1,500+ hotel rooms, 17 fitness centers, and numerous parks and entertainment venues.

BIKE ROOM

The building features a newly constructed, spacious and secure bike storage facility with a repair station.

24-HOUR SECURITY

Tenants have added peace of mind knowing the building’s professional management and security teams are standing by 24/7.

City Views
Fitness Center
Bike Room
24 Hour Security

Sustainability

LEED PLATINUM® AND ENERGY STAR® CERTIFIED

160 Federal benefits from notable sustainability upgrades that have resulted in its LEED Platinum® and ENERGY STAR® certified.

Building Facts

Flexible Floor Plates

The building offers 24 stories, totaling 388,266 square feet,
14-foot-by-10-inch column spacing running north/south,
19-foot-by-5-inch column spacing running east/west, and
8-foot-6-inch finished ceiling heights (9-foot-9-inch rough)

Elevators

12 Otis elevators include 10 passenger, 1 service, 1 hydraulic. All elevator cabs and lighting were upgraded in 2016.

Parking

Two-levels of subterranean parking is available accommodating approximately 100 vehicles.

Power Sources

4,000 amp, 3-phase, 4-wire, 277/480-volt mains, and 6.9 watts per rentable square foot, Distribution panel size: 200 amps with 120/208 and 77/480-volt services.

Emergency Generator

450 kW diesel-fueled

Security

24-hour security and on-site management

HVAC System

The building is cooled by a central HVAC system that was fully recommissioned in 2015. Major system components include two 500-ton cooling towers (installed 2008 and 2010) and two 450-ton centrifugal chillers (fully rebuilt in 2016). The HVAC system includes a leading online work order system and features an online preventative maintenance system that allows for remote access and ultimate controllability. The two levels of underground parking garage space have a fresh air supply and return fan system and CO2 detection.